Show I 1 THE MODEL 8 IU r aon A A uh aw introduce waugh efficiency into your blacksmith shop 4 41 A model 8 waugh h sharpener at the lawrence mine lordsburg Lords burg N mex the highest efficiency in sharpening and shan king steel is only obtainable with the model 8 waugh sharpener it produces perfectly gauged bits and shanks in the shortest possible time with the minimum consumption of air in addition to using less air at equal pressures than other machines it will operate effectively on lower pressures than are required by machines of similar capacity this sharpener not only saves in labor costs by greatly increasing the production of the blacksmith but his ability to keep the drill runner supplied with the proper steel increases E creases the drilling speed and reduces the upkeep on the drill 0 new york el paso DF DENVER NVER COLO seattle salt lake city los ange angeles leg butte joplin san francisco houghton ltd sole agents CANADIAN ROCK DRILL CO B C vancouver toronto cobalt out ont nelson y Is r A 11 at 5 ft W 1 Q burp rin ce con C on job JO b is 1 s well vell AV V under i way W ay we commenced work on our contract wit with h the prince consolidated mining smelting smelling Sm elting company at pioche nevada early this month may already an appreciable amount of w work ork has been done and everything is moving along as per schedule we are raising a foot shaft putting in all the connecting drifts stations and ore pockets on each level we are 66 bemons Demons 59 99 for speed it e e d but we do not slight any of the work when we finish a job of mine development every part of the workings is ready for the miners they can go right ahead get the ore out and begin shipments SPEED is the big element in mining operations these days old methods must be abandoned and organizations of specialists such as ours put on the job we make early profits possible FITCH FOR SPEED WALTER FITCH JR inc EUREKA UTAH contracting mine development and tunneling 1 |