Show in the operation of the eureka mines at eureka utah the company is drifting on the north and south fissure on the and a good body of ore is expected when the face reaches the cross fissure on the 00 some marketable ore is being mined in the cross fissure manager jackson C mcchrystal states that the mine is in excellent physical condition november shipments from the columbus rexall property at alta utah reached a total of goo tons mining men in general agree with manager M R evans that this ls is a good record considering that freighting outfits are hard to secure and the roads in poor door shape for hauling in no 1 high grade ore has been opened near where the is expected to be encountered outside of apparently uncalled for labor troubles everything is satisfactory at the property |