Show WALKER MILL TO START george 0 bradley construction engineer for the walker 11 iM pining company has advis ed the salt lake officers of the company that the new mill at the property near por tola california will go into operation about the dinst this means that the mine will be on a producing toasts basis within a few weeks and it is expected expect ed to show good 1 earnings from the outset the mill will be of from to tons daily capacity and the ore to be treated is of a good grade some of which will mill three or four tons into one ton of high grade concentrates drilling on the group has disclosed copper ore over a large area the bodies showing a thickness up to feet the highest val ues aes seem tobe to be at the greatest depth though toe there is a rich place at the 65 foot level and samples have run as high as per cent developments in the tunnel which is being ing run to cut the companas comp anys veins at depth depth is being watched with a great deal of interest ore developments have already occurred in these workings this tunnel is due e to be at a point under the shaft on the ground about the middle of the present anth where the main ore developments will ill begin to come in J ar R walker of salt lake is president of the company |