Show MOTOR ON ALTA RAILROAD construction work on the new narrow gauge railroad to the alta district ol of utah has been greatly facilitated by t the I 1 I 1 b re recent C e 11 t acquisition of a small motor mounted on wheels which is now delivering material in record tim time e it is now possible to deliver ties and rails to the end of the line as needed and unless the present storms interfere work it too much with construction should be finished to tanners flat by the middle of the month this will relieve tile the present ore congestion at alta as freight frei glit from there can call be delivered at tanners by tile the michigan utah aerial tram the motor negotiates tile the grade W without 1 t 1 ott d difficulty if and walter K under whose constructed supervision the line is being is pt P states that when the shay engine there is 1 to work after reaching tanners no doubt that it will handle the outgoing re r speed and incoming freight with all the quiren by tile the mine operators |