Show method et od of mi mine ne operation 0 erah on the daly judge mine is served through a main transportation tunnel a mile and a quarter in length which connects with the main shaft at a point 1200 feet below the surface this tunnel is equipped with electric haulage employing a general electric locomotive for that purpose the tunnel provides an avenue and outlet for all ores in transit to the mill and smelters shelters sm elters a all 11 waste being hoisted to the surface through the shaft which has three compartments of 0 miles from this shaft radiates many innels and drifts which lead to large areas f mineralized ground that has been so pro Ji active in the past and which holds out such ratifying promise for the future the continuity of the mineralized zone alich has been demonstrated by values al the most complete underground equipment every effort is made to supply the miners with adequate drills and tools for their work with the result that the company is enabled and does demand returns commensurate with facilities provided in order to prevent of which a heavy tonnage is being produced presents a most difficult type of mine operation inasmuch as the ground is extremely heavy and requires the heaviest form of mine timbers and constant care and attention the top slicing system of mining t levela DALY FISSURE DALY JUDGE park my utah JANUARY of L 0 ca rn C 0 a W F 1 10 1 A A A 1 I rz ready uncovered is conclusive proof that the large area of the southwest which is still and which lies directly in line the fissuring system of the mine offers a future which will far surpass all production of the past the daly judge presents a condition of any interruption of mining operations duplicate machine drills are kept on hand behind all working faces piston drills have been practically discarded and have been replaced with faster drilling air hammer machines the daly fissure the daly fissure of the daly judge out wi atol now successfully in vogue in this portion of the property offers an ail interesting solution for the mining of this form of ore deposits this portion of the mine is extremely we wet t and care must be taken at all times to provide vid 6 against sudden rushes of water mine aline operations are now being pros J w eci I 1 1 1 ted f from roin the level where important discoveries have recently been made to the 2300 foot level which is now being opened up in the more northerly territory owned by the company at the present time the company is producing about tons of mill ore and about thirty tons of shipping ore da daily ily A force of about men is employed judge dorelas orois about in character daly cont containing aaning lead silver three fourths sulphides sulp hides and zinc with a small percentage of copper and one fourth carbonate ore containing lead and silver |