Show THE THOMPSON QUINCY peter P harrington has submitted his april report of operations at the thompson quincy mine at park city utah in which he says have been mining some first class and mill ore from the fissure in the east side during the past month the first class averaged about one foot thick with about two feet of mill ore in the north side of the fissure the drift west from the east raise was driven ten feet and is all in mill ore at present shipped a car of first class to the sampler may 29 which weighed about tons the cost of labor and supplies was for the week ending may 3 he says have been taking out ore in the fissure in the east side during the past week the first class is about a foot wide with considerable sid erable mill ore in the north wall of tile the fissure the drift west from the east raise is all in mill ore at present started to drift east from the west raise on the top floor there is about eighteen inches of first class ore in the face at present mill nil took out fourteen mine cars of the t ore and four cars of first class during past week |