Show ARIZONA the no 1 furnace of the calumet arizona at bisbee is ready to blow in no I 1 was blown in june 2 four verber atory furnaces are being built the june output or the company was about 4 pounds of copper it is stated that a dredge will be placed on the placer field near dewey soon there is 2240 acres of this ground the value of the gravel has been placed at twenty four cents a yard and the average thickness is said to be thirty five feet daniel mccarthy is to have charge of the development for the syndicate controlling which is composed of kentucky missouri and california men the minerals separation company of london has given out some figures as aa to the operation of the 50 ton testing plant at the inspiration copper companas comp anys property all classes of ore except capping wole tried with extractions above 90 per cent A ton plant is now being built the minerals separation company is enthusiastic as to the future operations and claims very low costs |