Show sf trade notes sf 4 the neph plaster manufacturing company of salt lake dr will L Eller ellerbeck beek managing director has been awarded a contract tor for 1000 tons of finishing plaster to tc be used in the construction of the ha hotel at portland oregon the mine smelter supply company ol of salt lake was recently awarded the contract for the machinery for a pumping plant for the indian cove reclamation project at hammett idaho COD consisting of four units with a capacity of seven and a half second secona feet each two units making a lift of feet and two with a lift of feet the equipment embraces four krogh centrifugal pumps direct connected to alternating motors which are used to drive the pumps the power is furnished by the hydroelectric hydro electric plant of the twin falls power company the smine smelter supply company also fur bishes the necessary transformers together with switching and protective apparatus ap aratus since the last issue of the mining alining review the salt lake hardware company has moved from west second south street to its new store at main alain street this building has been in course of preparation for the past three months and the company now without doubt has the finest and largest establishment of this character to be found in the west the floor space is very extensive the arrangement is most convenient the lighting is excellent and a chance Is given for display that will be appreciated by patrons and customers the company carries and handles a varied and heavy line of mining machinery and supplies and more attention than ever before will now be paid to this branch of its business |