Show THE NEVADA DOUGLAS times yerington nev everything is progressing nicely at the nevada douglas mine and on the copper belt railroad in this district and it will not be many weeks before you will see ore trains running over the line from the mine to the smelter at the mine the trestle has been completed for the douglas tram which will carry ore direct from the mine to the cars the large pumps have been installed and the work of rn watering the property to the seventh level will begin immediately the work at the mine at the present consisting of opening up the on different levels so that ore can be extracted when the time arrives t ti ship it development work has disclosed new ore bodies on the foot level the f oot foot level and the foot level and the mine is getting gelting bigger every day the railroad grade has practically been completed and the work of laying the ties and rails will be completed in the next few weeks 0 |