Show DALY JUDGE REPORT park city company starts the new year with healthy cash reserve the daly judge mining company of park city has issued its annual report for the year 1910 and manager G W lambourne in summing up conditions says the company began the year alt with cash on hand closing the period with a net gain of this is especially gratifying in view of the extraordinary tra ordinary expenses incurred including for construction and in bi the acquisition of the new drainage ara inage accommodations it will be noted that the surplus earned in interest or within 24 of meeting the general legal expenses and taxes for the year the daly judge company acquired full drainage rights through the ontario tunnel for a period of ten years at an annual cost of the agreement called for the extension of the daly west 1550 foot level workings and the ontario drain tunnel to the daly judge line the 1550 foot daly west level corresponds to the 1900 buot level of the daly judge and a drift has been extended from the former to a point opposite our main shaft preparations are now under way to sink the shaft to the 1900 foot level and make connection with this drift the ontario tunnel is to reach the daly judge property about march 1 1912 and it eventually will connect with the shaft workings at or near the 2500 foot level of your company the daly judge company is the owner of out of the shares of stock issued by the snake creek mining and tunnel company in payment for properties acquired acu ired the snake creek tunnel is being driven at a very satisfactory rate of speed and it is now about feet from portal to breast several fissures heavily impregnated with iron have been encountered in this distance and a flow of water developed varying in volume from fifty to gallons per minute A very interesting mineral country lies directly ahead of the tunnel A vertical depth of feet will be gained superintendents report in general superintendent R T masons report is found that surface improvements include an air compressor with a capacity of 2100 cubic feet of free air per minute on the 1200 level the main drift was advanced feet the most important ore body was developed feet on its strike and 40 feet high above the 1100 this produced cars of milling and 2255 cars of shipping ore other on this level produced over tons of milling ore on the 1260 level 5 cars was the production ores were also algo produced on the 1400 1500 1600 and 1900 levels during the year ten leasers leaders have been operating two leases opened opened up ore which the company afterward worked profitably total prospecting and exploration work feet total production tons milling and tons of shipping ore the mill treated tons of ore dry weight from which tons of lead concentrates cen 2511 tons of iron and tons of zinc were made the mill was in service days of nine hours each thus averaging tons per day there were concentrated tons of crude ore into one ton of lead concentrates and all products combined tons financial statement balance jan 1 1910 ore sales crude concentrates zinc iron total ore sales interest earned ore surplus total sales and earnings total disbursements disbursement S mine account prospecting and dead work mill account ore expense construction ore expense surveying ontario drainage total balance dec 31 1910 the cost of construction was 84 cents a ton cost of marketing cost of prospecting and dead work a ton a total cost of a ton for tons the ores sold from to 2845 per ton the first being zinc the latter concentrates the output for 1910 was ounces silver ounces of gold pounds lead pounds zinc pounds copper sold for the mines total output is |