Show THE OHANA COMPANY mining expositor ely nev A carload of pipe for the new milling plant of the ohana company that is being erected at the mines in sacramento pass has been received here and will be sent over to the property as rapidly as possible four teams left yesterday and more will leave today there will be twelve or fifteen loads of the pipe which will be used to install a water power line from the springs to the mill for the purpose of operating the concentrating tables on which the valuable metal contents of the ore will be saved partly by amalgamation and partly in the form of concentrates that will be shipped to some smelter where all the values can be extracted manager burritt has also purchased a gasoline engine for power purposes at the mill which will be delivered soon at the site of the plant the engine was purchased from the stuart gold mines holding company at cherry creek and is capable of developing 33 h p it will operate the crusher and and furnish power for the tables also when for any reason the water power is insufficient or not available it is expected that the new plant will be ready to handle ore before the end of the year as the machinery is so simple that it will not take long to get it in place and no extensive building is required to house bouse it neither are any heavy foundations necessary it is probable if the ohana plant gives satisfaction that its construction will lead to the building of several other plants in the county as the cost as compared to the capacity is claimed to be extremely small |