Show california redding free press it is authoritatively reported from a london source that when the price of copper reaches 15 cents and shows a market tendency to remain in that region that the mountain copper company will erect at keswick shasta county the largest copper smelter on the coast san diego news the quartz diorite mining com company has recently opened up a shoot of ore on its jockey club claim that will from surface indications put the property among the best in the county they have twelve feet of ore that at ten feet will average 20 the company is making arrangements range ments to sink to the hundred foot level and to crosscut the lode at that depth nevada city transcript ID H WIl wilson sofi who is operating the bonanza king sixteen to one and other valuable properties in the alleghany allegheny Alleg hany district has secured a bond on the Ous tomah mine in nevada city the deal was consummated today between mr wilson vV ilson and the family of john T morgan president of the citizens bank who is the principal owner of the property work will be commenced immediately and efforts to that end have already been put forth by mr wilson el dorado nugget A party consisting of samuel montgomery sheriff of yolo county M B B potter potter formerly principal of the el dorado county high school and a gentleman by the name of craig are inspect ing the wagner mine on travis creek in the bear creek mining district the wagner is one of the many promising quartz claims in that section of the county and only needs a little intelligent labor backed with sufficient capital to enable proper work to develop a good paying mine san diego news the colorado mining milling illing Mi company has received its machinery the same passing through ramona on wednesday last the company expects to have the mill running the first of april the ore averages 10 per ton and from the present working there is enough ore in sight to run the present mill for many years to come the mill has a capacity of tons per day As soon as the present mill is in good operating opt rating shape the capacity will be doubled the power is received from a thirty two horsepower fairbanks morse engine which is large enough to run double the machinery now being installed hart enterprise the oro belle is fast getting in position for extensive and systematic development work the new forty horsepower hoist is ready to run as soon as connections are made with the cooling tanks the gallows frame is completed and carpenters are now engaged in enclosing the hoist house with corrugated galvanized 1 ze d iron manager W B andrews states that by monday the work of cutting the station at the foot level will be under way and in a few days thereafter sinking will be resumed A crosscut to the east on this level will also be started as soon as the station is completed and when the required distance is attained an upraise will be made to connect with the sixty foot in the north drift |