Show The Electric Railways Tomorrow morning the work of excavating exca-vating for the new power house for the Ogden street railway will begin The building will be two stories in height The lower floors will be occupied by the engines boilers and dynamos The upper floor will be used for offices of the street railroad company and for storage purposes The car house with a capacity of holding forty care will be annexed to the power house proper and will be 140 feet in length with a frontage of 70 feet The structure will be erected entirely of brick and stone and will be made as nearly fireproof fire-proof as possible The contractor expects to have the building build-ing completed and ready for tho machinery within thirty days The electrical appliances appli-ances are all to be here by the 15th of July and ready for operation by the 1st of August Aug-ust so it can be safely said that electric cars will be running through the streets of I Ogden within sixty days at the farthest Two car loads of line wire arrived yesterday I yes-terday which will be strung through the streets soon I The lines will be extended to Jarvis park I in the southwestern portion of the city and when completed the entire system will comprise over twenty miles of tracks andover I and-over forty miles or twenty tons of copper wire II The engines will be so constructed and arranged that it will take only one and three quarter pounds of coal to each horsepower horse-power per hour to run them while in the ordinary cases it takes three pounds |