Show Improvements Completed The remodeling In Kingsbury Hall will be completed by next according to Dean John and public lectures and entertainments will be held there for the remainder of the Several Important changes have been which will add greatly to the effectiveness of the The amplifying system connected with the only partially satisfactory in the has been completely and a new system It improves the organ tone and swells the volume many The stage of the Little In the basement of Kingsbury has been increased in size by the removal of a row of seats and extending the apron of the stage several The stage was so small formerly that it was impossible to pass from one side to the other when the scenery was In without crossing the A new system of operated from a suspended from the of the main will provide the stage with from the The Is large enough to bold an electrician who will operate the new system of spot Cat-walks through the roof had to bo built to facilitate safe and eaBy passage into the |