Show fi i f TO tl RESIDENTS RES relocation AUTHORITY UTAH PROJECT CENTRAL UTAH TOPAZ WAR June 19 1944 i 1 H 9 A A CF TOPAZ as to the present situ situation atio that you may be informed in order our statement attached center he the the water in lines in regard to project director in w v a s prepared by roscoe E bell assistant Co Con to community council the charge of operations and transmitted 1944 the council concurred in the nesting on june 1 10 at its meeting replacement replace rient as the most important of pipeline the of designation bhe project on current curre nt tasks to be done t stal ent reads the statement we have discussed a number of times the importance of the f who will for those people pipeline situation in the center the presents some time this for here necessarily remain from both maintenance center of the problem most serious v the standpoint of health and fire protection rt project on the projects fire hydrants tiro 1 there are forty out of because leaks in serious of out of service arc which are a serious creates condition hydrant this line tha fire exists during duriac the dry windy weather f fire hazard which pipelines linds because of the condition of the pipe leaks 2 the pools of water which have developed from heafy I to a camp and health are hazard life throughout the AE mosquitoes bosqui froes breeding places for and are excellent ater ater the camp with ww taS ahr main supply line which supplies be should and has deteriorated to a critical condition replaced as soon as possible use of water hott weather which increases the camp due to the lio rf 41 4 inay may floo dinC the it and the many leaks which are flooding supply uninterrupted continue an be impossible to continuo soon bo suf overr a twenty four hour period of culinary water ove the tanks to keep bc haintl maintained in tho water must be ficken vater aro soon oro them then from drying out aardd unless serious leaks impossible bo scorns seems t will likely contro hat it controlled llod it to maintain a continuous water supply very valuable ablo althoughh tho high school students have given ry althou followgoing the on pipeline tho assistance in kc toping the workas the as pos soon possible tod be initia ing program will bo initiated be asked to recruit five workers for temporary block will bo each blackwill the time that pipeline re work during tho to the pipeline pi asa polino on lines which serve their the with placement is being carried barad present of leaks in the arrangethe tho repair men in these those will assist block new pipeline p ipeUhe and excavating for and laying the vh the section chiefs ments will chief will release from be mads whereby vill men the recruited five assignment their regular assign monts arc urged to accept regular assignments residents of topaz are should not present work this on the water line in lieu licu of their ro with project operations because of the small seriously intorf oro v r 1 k H fi A al m t A time recruited at any one timo hereby solicited tian of vory resident in camp is the tho of through all that this bo effort be unified only because it will problem can bo be solved and a grave danger to our water supply fj averted I vyAAJJ i men so number of mon ef 1 I1 ra L T pro broj 1 i hoffman ct et lir actor t |