Show international SMELTER LEAD PLANT IS 18 NEARLY COMPLETE fourth blown in and Is eating copper ores fifth one now ready the order has been placed in utah lor for everything that the business men are capable of supplying for the construction st of the two lead fur furnaces rices at the Bm en olter bolter the grading Is completed and an agent of the company is in chicago placing orders tor for structural teel steel and other material which can not be purchased in utah tho the fourth copper ts to blown in and the fifth la is now ready to hive have the match applied th the e international company are supplying electric energy from the power plant at the smelter ir to the utah consolidated mine at bingham canyon 0 |