Show 0 MICHIGAN UTAH production I 1 the july production of the michigan utah at alta utah is given by norman W haire president of the company as 2000 tons only about half of which reached the smelters shelters sm elters owing to poor transportation facilities cili ties from the camp however the salt lake alta railroad under new management has improved conditions and early in august the company was sending down about thirty five tons a day judge haire says that with satisfactory shipping facilities the property is in condition to market tons daily the usual tonnage Is coming coining from the grizzly and lavinia tunnels and ore is being mined in two faces in the copper prince workings the company has stripped the big bedded vein which crops on the roadway above the lower workings here about thirty feet of sulphides sulp hides show carrying low values in copper with some silver and gold this product is being piled up for shipment |