Show TONOPAH BELMONT COMPANY DOUBLES CAPACITY OF HAMILTON MILL mil the tonopah belmont property at Hani hamilton ilton lias has in improved with development to such an extent that mill pla P have been changed said clyde A heller president derit ot of the the in company who passed through reno last night says 5 haa nevada mining press of the ath instant Foundation sW the been prepared for a ton concentrating plant and t first unit of 50 tons instead of 25 as first P planned I 1 a rine 1 i is is now no being built and will be completed early in aug august S ad the belmont recently purchased the cornell cor nell taine which joining its property and is driving a crosscut tunnel tha of will be the transportation adit from the p portal r orta I 1 01 00 tinnel a foot aerial bucket tramway carry carrat alile ne joae to the mill president heller visited the hamilton property PP route this week and stopped a day at tonopah To he wa was s en r to the belmont mine at wickenburg arizona P W racey superintendent of the nevada properties proper delort of at the belmont accompanied him arid gave e a good favorite g the old mine min e at tonopah To the news new vein in the drills a oil claim far to the north first found by ting show the 1050 foot level ha has been c cut ut by a drift crift on the 1100 s vein ing four feet of splendid ore the drift entyre entered A the ane and 05 some distance from where if was cubby the drills drill s a been advanced 25 feet with the full face in ore |