Show ONTARIO AND DALY Manager Ernest Bamberger Says Matters Are Not Being Hurried Manager Ernest Ham Bamberger berger of the Dal Daly and Ontario proper properties ties ret from the tho Park Sunday night ne lie reports having found every everything thing smoothly at the Daly West while the work of cleaning out the Ontario drain tunnel was progress progressing lug ing as usual On this trIp he did not find linci time to make an inspection of the Dal Daly but he says the probabilities are that will place a force of men rne at work wok in a of different places In Inthe the mine soon There has been no gen oral d l iron from New NewYork ew York as an yet and Mr lIr Bamberger is not hurrying matters at eIther of the ao ac acquired pending these instructions The work of cleaning clanning out the drain tUlu el he says sas is in progressIng favor favorably ably though slow on no ac account count of the nature of th the work The normal How of water vater is rUshing front from the mines and sometimes it is much above the normal and this will probably ably be bc the wa way things will run until the entire tunnel is freud fred or of the accumulated accumulated mass of loose timbers and all other kind of junk from the mine that has found its way into that avenue since the Hooding flooding of the mine occurred Mr lIr r states es that th there re is lots of snow around the mines at tile the present time and genuine winter wea weather ther prevails |