Show L A C 17 Bidding idding To Start December 22 On New Technology Building wy ji r w M 4 39 million Technology now v on its way vay Construction of the proposed proposed proposed pro pro- posed 39 million Technology Technology Technology Techno Techno- logy Building on campus is scheduled for bids on Dec 22 Plans call for the building to be in operation by the fall of 1972 The new v building will vill be bethe bethe bethe the fourth major structure structure structure ture on the Redwood Red Rd campus and will vill house el electronics electronics electronics el- el drafting and design design design de de- de- de sign technology architectural architectural architectural tural drafting data sing physics and several other courses The Instructional Instructional Instructional In In- Media Center also is planned for this new v facility Some new v courses being considered for the new nev building are instrumentation tion soil mechanics concrete concrete concrete con con- crete testing plastics and fiberglass technology The successful bidder willbe will vill willbe be announced later |