Show union pacific WH enter uinta basin salt lale late dec 2 the engineering dep department artmen t of the union pacific system is making preparations to send a surveying ing party into the uinta basin to run the final line for the proposed road from coalville Co alville into the uinta ba basin bain in the party will start early in the spring and as the union pacific already has as many as six different routes to choose f from om it is by officials that it will not tako take long to complete the survey it is rumored in the oregon short line office flom where the surveying party will ill be sent that the tho union pacific is preparing to ask for bids on the of the grade during the tile coming summer and that the contracts will be let lot the latter part of june it is estimated that it will take nt at least two years ears to complete the road one of the reasons why the union pacific system his ims not announced openly that it will ill begin the construction st of a railroad into tho the uinta basin barin during the coming summer is is that the officials cills fear tint thit if the tb e route is given out at this time the farmers along the right of way will increase the tile price of their land and causo cause the ramiro id td company corp pany to go to much expense in obtaining rights of way ay one official of the said yesterday that alt although bough people living in in a section which desires a railroad are willing to give the right of if way free when the read mad is being promoted yet when the survey becomes known and the right of way is 10 ought elices go aup up |