Show SUMMIT HIGHWAYS OIL SURFACE trean with the completion of the oiling of the three mile stretch of road from peep Pe texson ason to mountain green the state road forces engaged on this work have moved into summit county and are oiling ouma on one emile mile ol of highway through each of the towns of henefer echo wanshin wanship Wan ship peoa geoa marlon marion and kamas the contractor for the preparation of the road from baskin to emory in echo canyon Is putting on the heavy gravel layer preparatory to the placing of the oiled mulch which will be spread as soon as aa the gravel is ready the forces of the utah construction company engaged in the widening and straightening ot the road from morgan to henefer have completed the widening of three of the four rock cuts and have the ready to receive the gravel surface which will be placed within the next two weeks the plant tor for this work being in process of construction st the shovel engaged on this work near henefer has been temporarily assigned to thet the slide at devils gata but on completion of the work there will be brought back to the portion of the road adjacent to the weber river near henefer it is expected that this road will all be completed and the gravel topping installed before tall fall but ts oiling of the new road will not take place until next year when the abad from morgan to echo junction will be oiled together with the road from emory to the wyoming line which will give a completely oiled toad load through weber and echo canyons |