Show NEEDED N IS BEING ADDED TO OUR SCHOOL mr air hans tile the contractor and liis his force of etien have boon been busy for the cirit week putting now cement walks from tile street to tile front door and around tile grounds of our school house hero it in rill fill more they ar aro 0 also erecting a neat cicat wiro wire fence around the lie school grounds and the plumber ers will bo be busy in ill a D day or so installing toilets all and sinks for the city water in the school building itself these are much needed improvements and aid they will no doubt lie bo much appreciated by the students bi when they attend school next fall and winter the work is being carried forward as rapidly as it is is possible to do it and it will be completed before long tile the former school trustees of fill eill anoro are to bo commended for deciding to have this work done during the summer cummer months lis aft it is almost impossible to to do tile work alien students stu students vents are arc attending school mr Rami is is an all adept at this clas clams of work and wo we know that tile work will be done in ill ilia his usual elac bent manner |