Show CONTRACT LET FOR CON OF WUA aoka EXTAiN TION the contract art for the construction of an pipe line from the city reser vior to water cress spring was wa s let last saturday to lo thomas thomaa ue eL Lamar amar a well known contractor r nl t tho n 0 u northern 0 r th ern p part a r t 0 of f the state t a te and ot hess and at p present r es e a t a re resident zi d e n t of salt a 1 t L lake 0 city u I 1 tue ahe contract calls for the construction 4 st t r tion of a continuous coutin contin loua lous cement pipe me eight inches in dia mitor from me lae water cress spring to the city reser vior this line is to be built tad properly entrenched by mr de ajnar aaman tor 1700 A it t is thought that where the grade grada la is steep and the he velocity ut lit the water will be high that the dia mitor of the pipe may be reduced and the above named price cut air delamar is having his bis equipment sent down now and will move nere himself in the very near future 0 to o make his home at least until after me lue construction work is completed we believe to however wever that ones once here no ne will be ba loath to leave and that we may safely consider him a future permanent citizen of fillmore construction work will begin immediately edia tely after mr air De Lamars arrival and d nd it e is believed that considerable crench drenching trenching tren ching 6 and gravel hauling and possibly it if the weather remains good long enough some pipe laying will oe 09 done this tal fal work will be resumed again as soon as the weather will permit in the spring and by early summer the system should be completed mr air De Lamars bid was the lowest for the class of work and taking all into consideration the most far that the city received |