Show 1 TO MESS THE T E IT OF THE GREEN RNE HOPI COUNTI ta thomas W cameron TV kinkelar Win kelar frack D want and other st louis LOMIS 31 mo 0 i have cued wed app application atlon with apa renty ent three hundred and seven the state engineer to apar ty second foet feet 1716 ot water dally daily from the green river for power purport yur post e 4 the diversion is to be A t three miles south of the junca june of the green river and maud creek la in carbon carbo county the diverting work works will oo 00 a dam the length ot of which will be determined by the survey t agates tea and wast eway and steel pipes A T A the dam avi back the wat wah op up the green river for a ot of about thirty five miles and luske a it reservoir the water will be bo used to generate 61 electric power which will be distributed to various points in utah including salt lake city it la Is eald mid at salt lake city last Sa caneron cameron said that the articles of incorporation would be taken out just as quickly as and the work blurted started but the name rie of the had not yet been decided upon lie ile declined to say anything fertl further or until the legal matter matters la ia connection have been to other mat be he represented fit st louis louls capital and that there be another commercial power company in operation in utah just as soon aa as he lie and his as socia Boc latee tea can get the work done |