Show CASE OASE POSTPONED Alfred J. J Charles engineer of the Uintah Indian Irrigation project was in Duchesne last Saturday to act as a witness in the case of the United States government versus the upper Blue Bench canal company one on the exchange of water for Cor e Duchesne water The case was to havo have been tried at a special term of court March 31 but was postponed until April 30 Blue Bench desires this exchange for the reason that a canal can be built from Crom river to Blue bench at about one fifth what it would cost COt to build one from the Duchesne The government fears that priority of water right will be affected af af- 1 j by such an exchange l but ut the Blue Bench company denies such a possibility and Is willing to recognize recognize recognize nize the government right at all times and when water is klow low in m the Duchesne will wUl allow the government its it's prior use in river Federal Attorney E B B. B Ward o of Denver and Charles M. M Morris o of oC the govern govern- Salt Lake will represent ment |