Show U. U P. P Considering Extensions May Build Through Basin o 0 word has been received from a very reliable source that the Union Pacific contemplate building a line from Wanship Wanship Wan Wan- ship to Kamas Utah Some money has been set aside for branch lines arid and considerable considerable con con- work will be done this summer Bummer The residents of Kamas Valley are organizing to boost for this extension This line will follow a line surveyed by the Union Pa Pacific which is considered consider consider- ed the mos most feasible rout through th the basin and it has long been believed to be bethe bethe bethe the plan of the company to build Starting Starting Starting Start Start- ing at the U. U P. P line at Wanship the theline theline theline line goes to Kamas up Beaver Creek on to the Provo river then by a short tunnel to the Du Duchesne river Down Tn tho the river the survey runs through an open valley with an easy grade to Duchesne city From there the line to Randlett Randlett Rand Rand- lett and on into Colorado around Blue Mountain and up to the U. U P P. P line at Wamsutter Wyoming The U. U P P. P is said to have hav declared its intention to build this line as soon as warrant or In case another road should hould attempt to build into the tle basin This fact and the fact that this line is the least expensive to build of any surveyed that the U. U P P. P is one of the few companies that have the money to put it through and that other roads are to build through the basin basing g gives ves reason for the belief that the UPs UPs UPs U. U Ps P's activities will not stop at Kamas o 0 o |