Show pr project aj eject going ahead surveyors Sur are at work running tints alln on what la known atthe at the attl grand leGrand or bnell buell project there is about 19 1000 acres to ito be b wateree A dam will be b built 25 rolle miles this ide side gren green river and A power of boree orso power develop deT elop 1 ea 4 to lift the tb water un the lim li M higher up abe canal will run up pria river canyon and come out at cliff cilly siding from there will run on towards san ralael reef reer thia this project is a backed by capital and will bo bushed to completion without any deay delay |