Show ground f 1 broken for a factory D 0 mcdonald has secured the contract and started on the erection of the building to bo be erected just south of the etude baker building south eighth street to be used as a factory by the price macaioni company tho the building is to be of brick feet two stories and basement the latter to bo be 12 feet in depth and off in a suitable manner to accommodate most of the machinery of the factory the contract calls for the completion of the building in ample time to permit the starting of the I 1 factory by october 1 orders hive already been boon placed for the machin machir cry which is to cost about ind and gives the factory a 1 capacity of about boxes of macaroni day it was the original intention to build this factory up town but a defeet defect in the title to the laid in view caused the change in I 1 location oca tion |