Show all equipment in position esy at drain kwe tunnel shaft 0 tr the ruby shaft ai of the aff gintic tintic drain a tunnel y company is now V equipped with both steam and elec yv yi machinery electricity wt Is the gotlie caf for the work there but in order to avoid ambar even a temporary wa shut down on account iky of line trouble a steam 4 plant was installed thi 22 company aft haa occasion t fisit an fiS 7 team equipment last the severe storms aff put faw the ower corn boussion acy pany W a lines out of 7 sion there 7 waif wy haa been if le 6 little lation as 0 th e I 1 ik of open 7 ing a large fl ow 0 f represent rp E er by sinking Is a h ft but fro resent aff appear ff ty ances handicap fe ter t Is not g ol 01 ng to be a ser ious t ill abw e w 0 rk this is exceptionally to the of the I 1 C igat comp anies E V birch theMi nager says y that W the flow of baket which was developed W lira during the first abw two hundred feet of sinking will be pumped to the ff bur W face w from aw a reservoir 07 on the ff foot aalf level aff the ground vw through fw t which 0 the shaft is now being sunk is perfectly dry and aar it Is barely pos bible i that the shaft ff iffa ran be bent on doan awe to isia the tunnel fiM vi level 7 before ff en countering any more water |