OCR Text |
Show BIDS OPENED ON ZION PARK ROAD Lowest Proposal Is at Rate of $11,924 Per Mile Kcven bidders presented proposals to the atate road commission for the construction of the highway between Ash creek bridge to Arderson'a ranch on the main line of the highway to Xinn National park, todjy. The engineers engi-neers estimate nf the cost nf the highway high-way on concrete structure was fioo.-113.24 fioo.-113.24 or at the rate of II1.7U4.74 per mile, and on cement nibble construction construc-tion 1101.412 4. or SI3.S86.41 per mile. There waa a wide variation in the bids presented, the low hid. that of McAithur. Wlnaon Whitehead, he ink 9N7.030 fur concrete rouatructlon. or $1 1.424 per mile, while on rement rubble rub-ble the' figure waa $18,414. while the bid of the Fife Jensen Construction company of Cedar t'liy waa for concrete con-crete construction 1221.200. or 110.801 per mile, and for cement rubble It waa $214,495, or 120.182 per mile. |