Show I MILL FOR FOB THE COMSTOCK r The Comstock which has como come to the front with ore showing better belter than 50 0 per cent lead with some silver stIver and gold Jold has hIlS begun the construction of a 3 ton mill rail which is 15 expected to go SO into commission Slon this fall Superintendent Hickey who T Is up from tho the mine ordering material for tor the plant reports the ore in the drift off elf the level showing up In fine One form tonn and thinks that when the mill Is ready for lor work tho the product from Crom the mine will tax tl full Cull capacity of ot the plant |