Show GET READY FOR ECHO CONTRACT Reclamation Bureau B it 11 rea r c a ii 11 Prints Specifications for Bidders Construction work on the Echo reservoir project ct will probably be started before be Core the summer s Is ended with active building opera opera- operations operations operations confined to three units which Include the foundation for forthe forthe forthe the the darl near Echo the changing of ot the Lincoln highway oy between Echo and an l Coalville and the tho chang chang- changing changing ing of ot the Union Pacific railroads railroad's and Grass Gras Creek branches branch s son on higher of right Such U is Uthe I Ithe the view of ot E. E O. O Larson LarISon United States reclamation engineer who was in Ogden today with J. J R. R Alexander United States reclamation lion tion counsel to confer with Pres Pres- President PresIdent PresIdent ident A. A P. P Bigelow and other officers of ot the tho Weber River Wa Wa- Water Water Water ter Users' Users association Now that the land transfers have been agreed upon Secretary John Hooper of the association Is rushing the work on abstracts of or title that must be furnished to to the tho sald said the govern orr government government ment engineer In order that there win will be bo no great gnat gr nt delay the reclamation service Is 13 having the tho specifications printed for the con con- contractors contractors contractors tractors to use uso In making malting their bids As All soon as tIme the necessary legal steps have been completed I and an l that may be finished in a a week or BO so the advertising for forbids forbids forbids bids will start This advertising must bo be run rim for 30 days Then the bids will be opened Possibly this will wll bring the actual con con- construction construction work the tho latter part of ot tho the summer I expect that ac ac- actual ac- ac actual work ork will wl be under way about that time Because money mono Is not available at ot the tho present time for the tho entire project the tho expectation la is I that the work will be confined this Continued on en Pago Iago la o Two 1 GET GEr READ READY Y FOR w ECHO Continued from Page Pago One year to only three unite These are arl the portions ot of the work which will take taka the greatest length l ot of tho lime foundation work for tor the tho dam the moving mo ot of the thc Lincoln highway to a new level above the and the moving of the tho railroad lines to the the same level tl lines line Will borde- borde the borer th lake ak l formed by th the impounded water the dam Construction of the diversion canal connecting the tho Weber and Provo river rl will be taken up as the fourth unit being finished at the same time as the tho dam |