Show MACHINERY ERY IS NOW HERE electric foi 01 the glenwood plant milt ix alcin in tat 1 is po iii ii i 1 lile anil and na ill sonn liu be re 1 otili 1113 fm 11 lise wile i 1 up N ne for fri all attain illint il int lien A rhe fhe long expected for the glenwood extension of the local light companas comp anys arrived on last freight the consignment occupied two lar earo and consisted of W two 0 G 1 n volt generators ono one betel turbine waterwheel water wheel and a carload of pipe and fittings one generator as ns unloaded into the powel house here list Satu ida and nd will be set up and connected to the steam plant to deplae e the present single phase westinghouse machine the balance bili inee of the machinery was taken to glenwood on monda for the past tao mab a force of mm liae have been at voil oil on th the e tl in ision trusi OT on line aid th this is no nui into giani thie tie aie no 6 4 opper copper jimb abed in the three I 1 sa system stem in aking a total of about pounds of copper used 11 in tile fie bic line ahe nev nea generator is heing dinst ailed at the plant this jcck cek and is IB soon scion as ab some changes ching ci in the pit pil miry mary lines aie it the nea three phase system NN ill br be inaugurated rho present sant ma anai be utilized but if these should ltd fail nl new trans transform formis cis will be dinst instilled illch rhe bic meent ent volt ige on the primary ires is 1100 volts and the neu nea system all carry on the prim primaries arms at glen there thare is some act activity ity it the site men are at work on en the foundations for the machine md chines niese decse consist of 11 14 feet of solid cement rna masonry onry As the generator and water waterwheel wheel hac a peed of 1200 to 2000 revolutions per mantue it requires om ethin solid to offs offset et the vibrations from machines of si such ich high after the foundations are ei ef and the maL machines hines in place the building nill ill be erected o cr them the ditch for or the pipe is il I 1 ivady dag dj and the work of getting the hc be adgate for th tha caal md and icebox for the pipe will also be pushed along it ib 16 confidently expect t td that the aa lc Ct etlie ii current from clenoid Cle nood will ie switch switched cd or within six sit acks the new generator nrc ire of the re rc tolving field tape po the latest and best generator Kere gere made mi brown thi the manager is bending ebely energy towards the completion of the extension |