Show Bright Prospects for the Crescent The Crescent tramway which has been snowbound all winter has finally been opened by persistent work and pluck The snow encountered along the track has been deeper and much more difficult to remove than was at first supposed il S would be Since the opening of the track both firstclass and concentrating ore has been shipped over it from the mines principally for the purpose of testing S test-ing the condition of the track to the concentrator S con-centrator and sampler and from present i indications it is presumed shipments will I commence next week and continue uninterrupted unin-terrupted until snow closes down next fall over the track in such depth that it will be impossible for the company to make shipments The track has been found in excellent condition the entire length which proves that great care was exercised exer-cised in putting it down so as to avoid damages to it by the freezing and thaw ing of the ground over which it passes The shipments of the descent have been large and with their tramway in good running order throughout the summer we confidently believe it will discount any of its previous records Park Record |