Show CANYON ROAD TO SUMMIT TO BE IMPROVED AT COST agreement between salt lake county and the state road cimmie slon don tor for the construction of three bile miles of highway I 1 in parleys parley canyon the estimated cost to be was announced friday by 11 S keer ate e road engineer ahe the road will be of gravel surfaced federal aid standard from lambs lamb s canyon intersection to the summit along a new alignment that will reduce the grade grada and eliminate some of the curves mr kerr said surveys are to be completed this winter and bids for construction called for in the early spring it Ls is expected that a second project that of oiling the gravel surface will be carried out shortly afterward salt lake countes coun tys share of the tha project will be and the balance will be provided by federal aid appropriations aa college annual play is to be presented here F friday november at sal p m this play nowadays has the endorsement of mutual boards throughout the state and Is 15 capably directed and well staged the A C has a wonderful reputation forets for its plays and the current offering is one which will add to the glory of the school remember the place and date N S 11 S auditorium friday nov 15 at p rn |